Photos taken during shift from Mar. 1 - 8, 2007.  Top of Cuoricino cryostat, calibration source details, etc.  Calibration line consists of wound-copper wire with thin thoriated tungsten held together by teflon sleeve.
2007_03_Cuoricino
Elena filling LN
wiring and front-end electronics inside faraday cage, next to cryostat for cuoricino
close-up of cuoricino electronics
top of cyostat.  The line going up is the LHe fill line.
Cuoricino calibration goes into the green garden hose.  There are two inserts.
Cuoricino calibration goes into the green garden hose.  There are two inserts.
calibration source input.
IMG_0783.JPG
IMG_0785.JPG
IMG_0786.JPG
IMG_0787.JPG
IMG_0788.JPG
Radon meter sitting at bottom of Faraday cage for cuoricino.
Ladder that leads to top of cuoricino cryostat inside faraday cage.
Calibration source for cuoricino
IMG_0775.JPG
IMG_0791.JPG
IMG_0792.JPG
close up of end of teflon sleeve
top of faraday cage.  LHe line goes into the left port
Cuoricino LHe line, cryostat end.
Looking down from top of Qino Faraday cage toward the pump/fridge control set-up.
Elena is pulling out the LHe line from the dewar.
IMG_0801.JPG
Qino He liquefier (not in use)
Qino fridge control and pumps.
Qino pumps
Arrival of ICARUS tank (?) at LNGS
IMG_0806.JPG
IMG_0807.JPG
IMG_0808.JPG
IMG_0811.JPG
IMG_0815.JPG
IMG_0816.JPG
Assergi and surrounding valley seen from lab.
Funivia to Campo Imperatore.
The walkway up behind Funivia.
The walkway up behind Funivia.